Location
Raemoir Garden Centre
Raemoir Rd, Banchory, Aberdeenshire
Financial and Environmental Impact
Estimated Annual Production: 41.06 MWh
CO2 Savings: 11.54 tonnes
Timeline
Install start : 24th May 2021
Install finish : 28th May 2021
Products
50kWp SunPower PV system
Panel Model: 60x SunPower Performance 3 Modules 415W COM + 78x SunPower Performance 3 Modules 320W
Inverter Model: SolarEdge 50 kW 3 Phase Inverter
The Project
Raemoir Garden Centre is a 30 year old family business which thrives on providing high quality service and products varied between fantastic breakfast and home baked goods from their restaurant, seasonal gifts and homeware in the shop as well as plants and garden care.
Raemoir’s Director, Mr Mair has a vision to deliver a pleasant customer experience with strong commitments in supporting local communities and the environment. They decided to invest in solar PV system and contacted Ceiba Renewables to help reduce their electricity overheads.
We suggested SunPower panels to match Raemoir commitments and business model as SunPower is known for their high ethical and environmental standards on top of their superior durability, performance and warranty which also ensure a long-term peace of mind.
The Result
The solar PV system is now fully installed and performing well at Raemoir Garden Centre. It adds value to their environmental commitment along with additional financial benefits. We have heard great reviews from Mr Mair and we are excited to share their story.
Elliot Mair, Director at Raemoir said:
“From the start of this project, we have been impressed by Duncan and his team.
We received excellent advice and assistance on the design and technical aspects of this project and from our initial meeting to the completed installation, the efficiency and high standard of their work has been apparent.
We are looking forward to seeing the benefits of our Solar system and working with Ceiba Renewables for many years to come.”