Client
Business Client – Bringing Solar PV to a historic building in Bishopbriggs
Key statistics
Installed
-
16 x Solar PV – SunPower Maxeon MAX3 375W modules
-
16 x Solaredge Power Optimiser P485
-
SolarEdge SE5000H inverter
-
Tesla Powerwall 2 AC 13.5V
-
Tesla Gateway
Background
Given the building’s unique history as the Gatehouse for Cadder Cemetery, it was vital that any works were sympathetic to the building’s aesthetic and respectful of its heritage.
The Install
We had to modify the original design in line with feedback from SPEN, but with the use of Solaredge optimisers and Tesla Powerwalls, we were able to tailor an output that would work for the business and the building.
These works were carried out alongside a busy programme of other works, which also included the addition of a heat pump and new insulation. We liaised closely with all parties to ensure that works were carried out at a suitable time, and with minimal disruption to the overall business.
The Results
The results were nothing short of spectacular. Aesthetically sympathetic to the building, but providing the business with a high-quality installation that’s performing in line with how we expected it to. With this new renewable technology, the business has actively driven down energy costs and is maximising the use of its energy thanks to battery storage.
David Neely of Synergy Financial Planning commented:
“We recently renovated our offices, which included the solar PV and Tesla Powerwall installation from Ceiba Renewables. We wanted our business to be self-sufficient for our energy requirements so we renovated our offices including insulation, glazing, heat pump and then another crucial piece of the puzzle was the solar and battery storage combined with our Tesla EVs.
Our business helps our clients plan for their future and with that in mind, being able to demonstrate that we care about the future we leave our children with doing what we can to operate as an ecoconscious business, the installation from Ceiba Renewables has helped us achieve this, especially with the SunPower Maxeon panels which have Cradle2Cradle certification and the Solaredge optimiser system that allows every solar panel to perform to its optimal. And then of course, the Tesla Powerwalls which capture excess solar to allow us to run the office during the early morning/late evening and also charge from cheap-rate electricity, we have driven down the energy overheads of the business which helps us deliver more value to our stakeholders.
Ceiba Renewables has carried out high quality installations for us in the past and we have referred numerous customers as we recognise the quality they deliver to their customers. True to form they carried out another high quality installation, the solar PV and Tesla Powerwalls are performing as expected and we’re delighted with the results.“